| Project Period | Project Name | Customer | Location |
|---|---|---|---|
| August 2015 |
Improved air cleaning system of RSM Busan Factory’s casting room | Renault Samsung Motors | Busan |
| December 2015 |
Installed #3 CGL process ventilation systems | Dongbu Steel | Dangjin |
| December 2015 |
Diagnosed PL/TCM process ventilation system and installed W-FLES | Dongbu Steel | Dangjin |
| May 2016 |
Engineered spot ventilation system for welding line | Renault Samsung Motors | Busan |
| June 2016 |
Installed dilution ventilation system for #1 ETL basement | Dongbu Incheon Steel | Incheon |
| June 2016 |
Installed dilution ventilation system for No.2 CGL Ingot insertion room | Dongbu Incheon Steel | Incheon |
| July 2016 |
Installed spot ventilation system for HZG Door Line | Renault Samsung Motors | Busan |
| August 2016 |
“Engineered spot ventilation system and air cleaning system for PPL” | Dongkuk Industries | Pohang |
| October 2016 |
Engineered spot ventilation system for technical institute | GS Caltex | Daejeon |
| November 2016 |
Engineered spot ventilation system for PL/TCM Welder | Dongbu Steel | Dangjin |
| December 2016 |
Installed spot ventilation system for assembly factory | Renault Samsung Motors | Busan |
| March 2017 |
Diagnosed and engineered PCM process ventilation system and SPM process ventilation system | Shagang Group | Jiangsu Province, China |
| April 2017 |
Replaced Oiler Fume Exhaust System for pickling | Dongbu Incheon Steel | Incheon |
| May 2017 |
Produced and installed spot ventilation system for primer spreading process | Renault Samsung Motors | Busan |