Installation of Ventilation System for ETL Basement

System Introduction

Industrial Ventilation, Process Air Technology

Basement plate facility ventilation system installation

Period Contents
Design: 2 weeks
Installation: 6 days
  • Pollutant concentration and basement temperature decreased by the supply of external air
  • Draws an optimal result with a limited budget by maximizing cost-effectiveness using ventilation in comparison to the high-cost exhaust design
  • Optimizes fan motor power and a duct through DSBM
Back